Renewable Power – Large Photovoltaic
Edwards/Sanborn Solar and Storage Project, Kern County, CA – Terra-Gen, LLC, and Mortenson
Completing construction of Phase 1 of the world’s largest single solar battery/energy storage project with a total of 1.2 GW of solar power production and 2.5 GW hours of battery storage on 6,000 acres. The facility includes photovoltaic modules, substations, and BESS storage yards.
Bellefield Solar and Storage Project, Kern County, CA – 8minute Energy and Primoris
Currently, in construction for Phase 1 of a total 1.5 GW solar power production and battery storage project on 8,370 acres. The facility includes photovoltaic modules, substations, and BESS storage yards.
Westland Solar Park, Fresno/Kings County, CA Includes: Aquamarine, Slate, Solar Blue, Chestnut,
Scarlet 1 & 2 - CIM Group
One of the largest master-planned solar parks in the world, projected to be more than 2.7 GW of solar power production on 20,000 acres, housing 12 PV generating facilities. The park will include photovoltaic modules, substations, and BESS storage yards.
BLM Desert Renewable Energy Conservation Plan, Riverside County, CA Includes: Arica, Victory Pass, Oberon 1 and 2 Solar Energy Projects – Clearway Energy and SOLV
1.0 GW solar power production on 10.8 million acres of land. The facility includes photovoltaic modules, substations, and 600 MW of BESS storage.
Maverick 1, 4, 6, and 7 Solar and Storage Project, Part of the Palen Solar Site in Riverside County, CA – EDF Renewables and D.H. Blattner
600 MW solar power production, and 200 MW hours of battery storage on 3,500 acres. The facility includes photovoltaic modules, substations, and BESS storage facilities.
Daggett Solar and Storage Project, San Bernardino County, CA – Clearway Energy
650 MW solar photovoltaic facility, with 450 MW hours of battery storage on 3,500 acres. The facility includes photovoltaic modules, substations, and BESS storage facilities.
Mount Signal Solar – Phases 1, 2, and 3, Imperial County, CA – 8minute Energy
750 MW of total solar power production on 5,200 acres. The facility includes photovoltaic modules, and substations.
Tranquility and Tranquility 8 Solar and Storage Projects, Fresno County, CA – Signal Energy and Rosendin
480 MW of total solar power production on 3,500 acres. The facility includes photovoltaic modules, substations, and BESS storage facilities.
Garland Solar Project, Kern County, CA – Recurrent Energy and Rosendin
272 MW solar photovoltaic facility on 2,000 acres of land. The facility includes photovoltaic modules, substations, and BESS storage facilities.
California Flats Solar Project, Monterey County, CA – First Solar and McCarthy
280 MW solar photovoltaic facility on 2,900 acres. The facility includes photovoltaic modules and several substations.
Centinela Solar Project, Imperial County, CA - LS Power Group
170MW solar photovoltaic facility on 2,200 acres. The facility includes photovoltaic modules, mounting structures, electrical wiring, inverters, transformers, an AC electric collector system, and a project electric substation.
McCoy Solar Project, Blythe, CA – NextEra Energy
250MW solar photovoltaic facility on 2,300 acres of BLM land. The facility includes photovoltaic modules, mounting structures, electrical wiring, inverters, transformers, an AC electric collector system, and a project electric substation. The project also included a 14.5-mile generation tie-in line and a two-acre switch yard connecting with Southern California Edison's Colorado River Substation.
Panoche Valley Solar Project, San Benito County, CA – ConEdison
130MW solar photovoltaic facility on 4,717 acres of land. The facility includes photovoltaic modules, mounting structures, electrical wiring, inverters, transformers, an AC electric collector system, and an electric substation.
Elara Solar Project, Frio County, TX – 7X Energy and SOLV
175MW solar photovoltaic facility on 1,700 acres of land. The facility includes photovoltaic modules, mounting structures, electrical wiring, inverters, transformers, an AC collector system, and an electric substation.
Airport Solar Project, Lake County, OR – Obsidian Renewables, LLC and SOLV
60MW solar photovoltaic facility on 315 acres of land at the Lakeview Airport. The facility includes photovoltaic modules, mounting structures, electrical wiring, inverters, transformers and AC collector systems, and an electric substation.
Mojave Solar Project, San Bernardino County, CA – Abengoa
280 MW solar project that utilizes parabolic trough technology to solar heat and transfer fluid (HTF). The hot HTF generates steam in solar steam generators, which expand through a steam turbine generator to produce electrical power from twin, independently operable solar fields, each feeding a 125MW power island.
Pioneer Solar Project, Adams County, CO – GCL Energy and SOLV
110MW solar photovoltaic facility on 2,000 acres of land. The facility includes photovoltaic modules, mounting structures, electrical wiring, inverters, transformers, an AC collector system, and an electric substation.
Bellflower Solar Project, Henry/Rush Counties, IN – Lightsource bp and SOLV
165MW solar photovoltaic facility on 1,400 acres of land. The facility includes photovoltaic modules, mounting structures, electrical wiring, inverters, transformers, an AC collector system, and an electric substation.